When you start planning a remodel, one question usually crowds out the rest. How much will this cost, and can I trust the number? It’s a fair worry. Most remodeling horror stories you’ve heard aren’t about bad craftsmanship. Instead, they’re about a budget that quietly doubled while the work dragged on. A fixed-price remodeling contract exists to solve exactly that problem. It puts a clear total on the table before construction begins. It also shifts the risk of hitting that number off of you and onto the builder.
Below is an honest look at the contract structures you’ll find in Seattle. We also explain why we recommend fixed price for most projects, and when a different structure makes more sense.
The contract types you’ll encounter
Before you can weigh the value of any one structure, it helps to know the field. On a residential remodel, you’ll generally run into three:
Fixed price
The scope is defined, and the price is the price. The contractor carries the risk of delivering that scope for that number. Say a subcontractor’s bid comes in high or a task takes longer than planned. In that case, the builder absorbs the cost, so it never shows up as a surprise on your invoice. A change order covers legitimate changes separately, but the base contract holds.
Time-and-materials (also called cost-plus)
Time-and-materials and cost-plus are the same thing under two names. You pay the actual cost of labor and materials as they occur, plus a markup. There’s no firm total up front, so you find out what the project cost when the last nail goes in. It’s flexible, which sounds appealing, but that flexibility comes at a real price we’ll get to below.
Not-to-exceed
A not-to-exceed adds a cap on top of a cost-plus arrangement. You pay actual cost plus markup, but with a ceiling (“no more than 10% over this estimate”). It’s a middle ground. It keeps some of the flexibility of cost-plus while giving you a worst-case number to plan against.
Why we recommend fixed price for most remodels
In our early years, like many growing firms, Crescent Builds worked mostly under time-and-materials and cost-plus contracts. Over time, our planning process matured, with complete drawings, defined scopes, and trade pricing locked in before construction. Then we noticed something: our projects consistently landed on the budget we’d set during estimating. That raised an obvious question. If we had the systems to estimate accurately, why not give clients a firm price from the start? And why not stand behind it? We moved off time-and-materials about a decade ago. Since then, fixed price has been our standard for roughly 99% of our design-build projects.
The reason is accountability. A fixed price puts the pressure where it belongs: on the builder. The builder has to plan thoroughly, estimate honestly, and manage the job to the agreed number. It gives you a clear total. Just as important, it ties the payment schedule directly to construction, so you always know what’s coming and when.
A payment schedule tied to real progress
On our fixed-price projects, payments track the build, not the calendar. After the design and pre-construction phases, you pay roughly 20% before construction begins. We then spread the remaining 80% evenly across construction and match each installment to work happening on site. If the schedule shifts, the remaining payments shift with it. That structure creates shared accountability. We don’t get ahead of the work, and you never pay for progress that hasn’t happened.
The honest case against time-and-materials
Time-and-materials is the highest-risk structure for a homeowner, and it’s worth being direct about why. A T&M project starts as a rough estimate, and no one knows the true cost until the work is finished. The industry is full of projects that ran twice the time and twice the budget. Under time-and-materials, the client pays that final bill, however the hours added up or the trade bids came in. The structure also removes the builder’s incentive to estimate accurately or plan pre-construction thoroughly. After all, any overrun simply flows through to you.
That’s the trade-off hiding inside “flexible.” Some clients don’t realize how much risk they’re taking on, so we’d rather say it plainly. On a defined remodel, cost-plus and time-and-materials move the budget risk from the contractor to you.
When a different structure makes sense
Fixed price is our recommendation, not a rule. We do offer time-and-materials, cost-plus, and not-to-exceed when a project calls for it. Two situations come up most often:
- Open-ended work. Sometimes no one can define the scope in advance, as with some repair, restoration, or investigative work where you don’t know what you’ll find until you’re in it. In those cases, a fixed price would just mean padding it with guesses. A cost-plus arrangement, often with a not-to-exceed cap, fits that reality better.
- Moving faster than fixed-price planning allows. A fixed price depends on thorough up-front planning, and that planning takes time. Some clients want to start sooner than that process allows. In that case, a cost-plus or not-to-exceed structure can get shovels moving faster, as long as everyone understands the risk.
For exactly these reasons, time-and-materials is often the right call for our Repair + Refresh work. No single structure is always right. Instead, the structure should match the work, and you should understand the risk you’re accepting either way.
How fixed price fits our design-build process
A firm price is only trustworthy if the planning behind it is real. That’s where our design-build process does the heavy lifting. Before we ever quote a fixed number, we develop detailed drawings and write clear scopes of work. We also finalize selections and specifications, then gather competitive trade pricing on coordinated documents. That pre-construction rigor lets us stand behind the price. The number reflects the true, carefully scoped cost of your project, not a buffer padded against uncertainty.
How Fixed Price Changes the Build
It also changes how the build itself feels. Because we settle the design, plan, and trade pricing before demolition, construction runs like pressing play on a program we’ve already engineered. We still expect the unexpected, especially in the first third of any remodel (early construction discovery). Opening walls in an older Seattle home can reveal odd framing, hidden water damage, or a subfloor that needs reinforcing. But our change-order process handles those genuine unknowns cleanly, separate from the base price. That way, they don’t get tangled up with things we could have nailed down earlier. And when scope shrinks or gets refined, clients see credits, not just add-ons.
It’s the same discipline behind our award-winning work, including a 2026 national Chrysalis Award for our Olympic Hills whole-house remodel. Are you comparing bids or just starting to plan? Either way, ask any builder how they structure their contracts and payment schedule. The answer tells you a lot about who’s carrying the risk. We cover that question in How to Choose a Remodeling Contractor in Seattle. It also pairs closely with Why Online Remodel Cost Estimates are so Often Wrong and The Common Remodeling Mistakes Worth Avoiding. If you’d like to talk through your project and which structure fits it, Contact Us. You can also browse Our Work to see the range of work firsthand.