The range is wide. For example, a bathroom remodel typically runs 5 to 8 months from first conversation to completion, and a kitchen 6 to 10. Meanwhile, a full-scale renovation in Seattle runs 12 to 24 months from first conversation to move-in.
Construction is usually the longest single phase. Still, planning and permitting take up more of the calendar than most people expect. Here’s roughly how it breaks down:
Design and pre-construction: typically 5 to 6 months, and 3 to 8 months from smaller to larger projects.
Discovery, Design, and Pre-Construction: programming, schematic design, material selections, budgeting, and permitting. In practice, these phases overlap rather than running end to end. Because we’re a design-build firm, budgeting advances alongside design, and permitting runs concurrent with planning.
A note on permitting. It’s the least predictable part of the schedule, and it depends heavily on where you’re building. Review times at Seattle SDCI shift with permit type and department workload. The same holds in King County and cities like Kirkland, Shoreline, and Edmonds, each with its own process and schedule. Similarly, projects in landmark districts or requiring land use review take longer anywhere. For that reason, we submit as early as the drawings allow and keep design moving while we wait.
Construction: 3 to 12 months, depending on scope. For instance, a single bathroom can be done in about three months. By comparison, a major whole-home remodel typically runs seven to twelve months.
A full-scale renovation sits at the upper end of every range. Real projects also include time between phases for decisions, contracts, and selections. That’s how a 12 to 24 month total comes together. Either way, we’ll map out a realistic schedule for your specific project in our first conversations, before you commit to anything.