The range is wide. A bathroom remodel typically runs 5 to 8 months from first conversation to completion, and a kitchen 6 to 10. A full-scale renovation in Seattle runs 12 to 24 months from first conversation to move-in.
Construction is usually the longest single phase, but planning and permitting take up more of the calendar than most people expect. Here’s roughly how it breaks down:
Design and pre-construction — roughly 3 to 8 months.
Discovery, Development, and Planning: programming, schematic design, material selections, budgeting, and permitting. These phases overlap rather than running end to end — because we’re a design-build firm, budgeting advances alongside design, and permitting runs concurrent with planning.
A note on permitting. It’s the least predictable part of the schedule, and it depends heavily on where you’re building. Review times at Seattle SDCI shift with permit type and department workload, and the same holds in King County and cities like Kirkland, Shoreline, and Edmonds — each runs its own process on its own schedule. Projects in landmark districts or requiring land use review take longer anywhere. We submit as early as the drawings allow and keep design moving while we wait.
Construction — 3 to 12 months, depending on scope. A single bathroom can be done in about three months. A major whole-home remodel starts around eight months and runs to twelve months or more.
A full-scale renovation sits at the upper end of every range, and real projects include time between phases for decisions, contracts, and selections — which is how a 12 to 24 month total comes together. We’ll map out a realistic schedule for your specific project in our first conversations, before you commit to anything.